01 July 2014

Warehouse Extension Gate 20, Associated British Ports



Project summary
 

  • Region: Hampshire
  • Value: £4,000,000
  • Contract terms: ICE
  • Contract length: 36 weeks
  • Procurement: Design + Build
  • Completed: July 2014
  • BREEAM: Excellent
  • Customer Satisfaction: 86%
  • Site features and challenges: Contamination removal, services diversion, traffic flow management, occupied property
  • Community: Midas opened the site to a local fire brigade while the scaffolding was erected, allowing it to be used as a training facility for working at height
  • Awards: Silver Considerate Contractors Award 2015

    Midas was contracted to add a 6,000m² extension to a 15,000m² warehouse situated on the Southampton Western Docks site, 200m from the water’s edge. This retail logistics distribution unit remained occupied and operational throughout the project. The extension used a quick installation method for the concrete floor; steel fibres were fed into the concrete as it was poured. Energy and environmental initiatives included the installation of 800kW of roof mounted PV array (across both extension and existing building), energy efficient lights, bicycle storage, changing facilities, restricted flow water outlets, and the segregated metering of the building's power.